top of page

INSTALLATION

INSTALLATION DONE RIGHT

Promstahl use both their own staff and approved sub contractors to complete installations. Every person who sets foot on site has a valid CSCS card and is either in possession or working towards a relevant qualification. Installation can be planned in to our engineers calendar as far as 2 years in advance and we will often look to assign staff based on their particular skillset to each job for a smoother installation from start to finish.  

PROMStahl can supply and install the following:

  • Dock levellers

  • Dock doors

  • Dock shelters

  • Dock bumpers

  • Loading houses

  • Wheel guides

  • Level access doors

  • Roller shutter doors

  • High speed doors

  • Personnel doors

  • Fire doors

​Our installation teams stand out for their professionalism, efficiency, and cost-effectiveness. We pride ourselves on having a skilled team that is dedicated to delivering high-quality installations. Our streamlined processes ensure that projects are completed in a manner which minimises downtime and maximises productivity. Our engineers are competitively priced without compromising on quality, making us the ideal choice for your installation needs.

Our Team

Promstahl 3.png

Meet The Team

bottom of page