INSTALLATION
INSTALLATION DONE RIGHT
Promstahl use both their own staff and approved sub contractors to complete installations. Every person who sets foot on site has a valid CSCS card and is either in possession or working towards a relevant qualification. Installation can be planned in to our engineers calendar as far as 2 years in advance and we will often look to assign staff based on their particular skillset to each job for a smoother installation from start to finish.
PROMStahl can supply and install the following:
-
Dock levellers
-
Dock doors
-
Dock shelters
-
Dock bumpers
-
Loading houses
-
Wheel guides
-
Level access doors
-
Roller shutter doors
-
High speed doors
-
Personnel doors
-
Fire doors
​Our installation teams stand out for their professionalism, efficiency, and cost-effectiveness. We pride ourselves on having a skilled team that is dedicated to delivering high-quality installations. Our streamlined processes ensure that projects are completed in a manner which minimises downtime and maximises productivity. Our engineers are competitively priced without compromising on quality, making us the ideal choice for your installation needs.